Matters needing attention in setting up punch in punch manufacturer
日期:2019-07-18 阅读数:200
Punch is widely used in electronics, communications, computers, household appliances, furniture, vehicles, hardware parts and other stamping and forming, the following is a brief introduction to its placement attention.
1. Check whether the accessories and vulnerable parts are complete according to the packing list. At the same time, the punch should be placed in a dry place for three to four days to drive out the moisture in the motor and electrical equipment. If necessary, the instrument should be used to measure.
Check whether the electrical insulation is good and reliable.
2. According to the foundation drawing, after the foundation is solidified, the press is safely placed on it, and the horizontal degree of the working table of the press is checked by the level meter, and the deviation of the length of each 1OOO mm shall not be greater than 0.3mm.
3. After the tipping punch corrects the level, install the anchor bolt, pour the concrete into the square hole, and wait until the concrete is completely solidified before it can be started.
4. After installation, clean the antirust grease on the surface of the press with kerosene. Be careful not to damage the paint surface during cleaning. At the same time, clean all oil holes, oil paths and oil cups. Do not use metal or sand cloth during cleaning.
Then check that the grounding wire is connected.
Before installing the punch, you will have a basic understanding of it, which will reduce unnecessary trouble in the future. I hope the above story will be helpful to you. If you have more knowledge you want to know, please call the company.